Group: Forum Members
Posts: 33,
Visits: 144
|
Our scheduler has recently asked me the following:"Is there anywhere in Myriad where one can look to see what has been scheduled? The list assign reflects what you wish for the schedule as dated by us."The only ways I know of are to use the "Goto" icon on the far right of the schedule display in Myriad playout to jump to a specific time and date, or to look back at the scheduling logs produced by AutoTrack - but I think this is too detailed (he only wants to know what clocks have been scheduled, and not within the clocks). First thing I did was to go to the Autotrack manual, to find I don't have one - only the quick guides (which happen to mention the AT manual). |